8. Which of the following topics should be discussed with the customer FIRST, prior to designing a backup
and recovery solution?
A.Off-site tape recovery
B.Disaster Recovery Plan (DRP)
C.Recovery Point Objective (RPO)
D.Availability of a secondary site
ANSWER: C
9. A rapidly growing customer is concerned with the possibility of a natural disaster occurring in the area.
They currently have two AIX servers, both being backed up locally to an IBM TS3500 Tape Library. Tapes
are taken offsite nightly.
What is the next level of disaster recovery keeping cost as a concern?
A.Implement HACMP between the production and remote location.
B.Make multiple copies of the data each night for local and remote use.
C.Move the tape library to a remote location and perform backups nightly.
D.Duplicate their existing environment (servers and library) at a remote location.
ANSWER: C